Andre Greeff
About Candidate
I am a dedicated Site Manager with 15 years of experience and an additional 4 years as a General Civil Foreman. My expertise spans concrete work, site management, and leading teams to successfully deliver projects on time and within budget. I am a proactive problem-solver with strong communication skills, enabling me to effectively collaborate with teams, clients, and stakeholders. I am passionate about maintaining high safety standards and ensuring quality control in all aspects of construction work. Adaptable and reliable, I thrive under pressure and am committed to achieving excellence in every project I oversee.
Location
Education
High School Diploma with key subjects including Afrikaans, English, Mathematics, Physical Science, Fitting and Turning, and Technical Drawing.
Work & Experience
• Proven leadership as General Civil Foreman at JVZ Civil Construction • Specializing in Stormwater Erosion Control and Bulk Earthworks. • Skilled in terrain preparation, riprap installation, and riverbank stabilization. • Proficient in laying 450mm HDPE watermain pipes and managing stormwater systems. • Key contributor to the Klapmuts Bridge and R44 projects, including intersection widening, layer works, and asphalting. Oversaw gravel road upgrades at Touwsriver, • and directed roadworks involving concrete stormwater pipes, kerbs, and paving. Key Achievements: • Led stormwater erosion control projects, ensuring environmental compliance. • Directed efficient Bulk Earthworks operations and terrain preparation. • Installed 450mm HDPE watermain pipes, improving utility infrastructure. • Contributed to successful Klapmuts Bridge and R44 widening projects. • Upgraded gravel roads and stormwater systems at Touwsriver. • Delivered high-quality roadworks, including kerbs, paving, and stormwater installations.
• Spearheaded comprehensive civil infrastructure projects at Baseline Civil Contractors as Site Manager, focusing on bulk civil services and road construction in Macassar. • Expertly managed the installation of critical sewer, water, and stormwater pipelines, coupled with roadworks for the rehabilitation of Sir Lowry's Pass Road and Old Sir Lowry's Pass Road. • Led the construction of civil engineering infrastructure to support the development of incremental areas in Khayelitsha, South Africa, ensuring robust infrastructure work. • Oversaw the intricate Sir Lowry Outfall Sewer project, implementing HDPE-lined bulk sewer systems and associated roadworks in challenging mountainous terrain. • Directed the rehabilitation of Main Road 189, enhancing connectivity from Kraaifontein to Main Road 174, and ensuring the road's structural integrity • Successfully rehabilitated MR348 and upgraded DR1611 and DR1599 near Glentana, demonstrating expertise in coastal infrastructure enhancement and resilience
• Spearheaded underground services and road construction projects within established communities at Bardale Housing Development Phase 5B as a Site Manager for Western Cape Construction (Company Liquidated). • Successfully delivered infrastructure enhancements, including underground services and road construction, at Summer Club Estate. • Led the road upgrade, retention pond construction, and berm creation at Onverwacht Village, ensuring improved community facilities. • Managed road sign modifications and the construction of additional slipways for ALE Transport, facilitating the efficient transport of wind turbines from Saldanha to Caledon.
• Spearheaded infrastructure enhancements for Bardale Housing Project Phase 1 with Requad Construction (now Western Cape Construction), focusing on service upgrades and road improvements. • Led the construction of underground utilities and paving of roadways for Rola Motors Somerset West, ensuring robust infrastructure. • Managed comprehensive development of bulk earthworks, underground services, and paved roadways for Audi Motors Somerset West, delivering high-quality results. • Directed the construction of underground services and asphalt roadways for Croydon, contributing to the region's urban development.
• Expertly executed storm water infrastructure, road construction, and structural developments on Onverwacht Road. • Spearheaded the encasement of the Steenbras water main, channel construction, and road upgrades on Beach Road/De Beers. • Delivered comprehensive underground services, roadworks, and boundary wall construction for Tafelzicht Malmesbury. • Managed the construction of underground utilities and road development on Beach Road/De Beers. • Oversaw the establishment of subterranean services and road infrastructure in Paarl. • Conducted large-scale earthworks and sewer installations at Fairview Golf Estate. • Led the development of a parking facility and storm water management structures for GG Haulers. • Directed the construction of underground services for Welgevonden Estate. • Implemented open channel construction and storm water systems at Nautilus Village. • Coordinated electrical trenching and sidewalk construction for Lafontana.